Production Performance of Oil & Natural Gas Sector for June, 2016

Crude Oil
1.      Crude oil production[1] during June, 2016 was 2966.54 TMT which is 0.08% higher than target but 4.34 % lower than the production achieved in June, 2015. Cumulative crude oil production during April-June, 2016 was 9000.94 TMT which is 0.30% higher than target for
the period and 3.33% lower than the production during corresponding period of last year. Unit-wise and state-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of June, 2016 and cumulatively for the period April-June, 2016 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.

Table-1: Crude Oil Production                                                                              (in TMT)
Oil Company
Target
June (Month)
April-June (Cumulative)
2016-17* (Apr-Mar)
2016-17*
2015-16
% over last year
2016-17*
2015-16
% over last year
Target
Prod.
Prod.
Target
Prod.
Prod.
ONGC
22393.40
1798.35
1802.99
1853.95
97.25
5452.85
5492.07
5574.44
98.52
OIL
3280.10
263.10
265.37
271.28
97.82
790.90
798.18
836.98
95.36
PSC Fields
10839.32
902.58
898.19
975.89
92.04
2730.36
2710.69
2899.61
93.48
Total
36512.83
2964.03
2966.54
3101.12
95.66
8974.11
9000.94
9311.03
96.67
            *: Provisional

Figure-1: Monthly Crude Oil Production 


Unit-wise production details with reasons for shortfall have been given in following sub-sections:
1.1  Crude oil production by ONGC during June, 2016 was 1802.99 TMT which is 0.26% higher than the monthly target but 2.75% less when compared with June, 2015. Cumulative crude oil production during April-June, 2016 was 5492.07 TMT which is 0.72% higher than target for the period and 1.48% lower than the production during corresponding period of last year.  Reasons for shortfall in production in some fields are as under:
·         Gujarat: Closure of wells in Gandhar / North Gandhar fields due to repairs/ plant shutdown by M/s. GAIL. Ceasure of wells in Padra field. Increase in water cut in Anklav & Akholjuni fields. 
·         Assam: Power shutdown & less gas injection pressure
·         Rajahmundry: Closure of 24 wells due to repair / replacement of Kadali-Tatipaka & Endamuru-Oduru GAIL pipelines.

1.2     Crude oil production by OIL during June, 2016 was 265.37 TMT which is 0.86% higher than monthly target but 2.18% less than June, 2015. Cumulative crude oil production during April-June, 2016 was 798.18 TMT which is 0.92% higher than target for the period but 4.64% lower than the production during corresponding period of last year. Reasons for shortfall in production are as under:
·         Rise in water cut in wells of Greater Hapjan, Bhogpara & Greater Chandmari fields and Environmental loss.

1.3    Crude oil production by Pvt. /JVs during June, 2016 was 898.19 TMT which is 0.49% lower than the monthly target and 7.96% less then compared with June, 2015. Cumulative crude oil production during April-June, 2016 was 2710.69 TMT which is 0.72% lower than target for the period and 6.52% lower than the production during corresponding period of last year. Reasons for shortfall in production are as under:
·         Natural Decline in Ravva, Mangala, Panna-Mukta & Underperformance of Bhagyam wells in RJ-ON-90/1
·         Under performance of wells of KG D6 due to sand ingress and water loading.
·         Production from M&S TAPTI stopped in March, 2016.
·         Underperformance of KG- OSN-2001/3

Natural Gas
2.      Natural gas production during June 2016 was 2598.41 MMSCM which is 3.46% lower than the target for the month and 4.48% lower than the production during corresponding period of last year. Cumulative natural gas production during April-June, 2016 was 7744.66 MMSCM which is 2.49% lower than target for the period and 6.05% lower than the production during corresponding period of last year. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of June, 2016 and cumulatively for the period April-June, 2016 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
            Table-2: Natural Gas Production (MMSCM)
Oil Company
Target
June (Month)
April-June (Cumulative)
2016-17* (Apr-Mar)
2016-17*
2015-16
% over last year
2016-17*
2015-16
% over last year
Target
Prod.
Prod.
Target
Prod.
Prod.
ONGC
22743.43
1793.76
1748.61
1800.99
97.09
5231.05
5172.41
5481.87
94.35
OIL
2905.55
232.61
241.25
225.04
107.20
716.65
730.71
641.64
113.88
PSC Fields
8425.44
665.28
608.55
694.37
87.64
1995.06
1841.54
2119.84
86.87
Total
34074.42
2691.64
2598.41
2720.40
95.52
7942.76
7744.66
8243.34
93.95
            *: Provisional

Figure-2: Monthly Natural Gas Production 

2.1      Natural gas production by ONGC during June, 2016 was 1748.61 MMSCM which is 2.52% lower than the monthly target and 2.91% less when compared with June, 2015. Cumulative natural gas production during April-June, 2016 was 5172.41 MMSCM which is 1.12% lower than the cumulative target and 5.65% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
·         Offshore: Natural decline from Bassein field and restricted withdrawal of gas by GAIL in EOA
·         Gujarat: Closure of wells in Gandhar / North Gandhar fields due to repairs/ plant shutdown by M/s. GAIL.
·         Karaikal: Less off-take by GAIL consumers

2.2      Natural gas production by OIL during June, 2016 was 241.25 MMSCM which is 3.72% higher than the monthly target and 7.20% higher than June, 2015. Cumulative natural gas production during April-June, 2016 was 730.71 MMSCM which is 1.96% higher than the cumulative target and 13.88% higher than the production during the corresponding period of last year.
2.3      Natural gas production by Pvt. /JVs during June, 2016 was 608.55 MMSCM which is 8.53% lower than the monthly target and 12.36% less when compared with June, 2015. Cumulative natural gas production during April-June, 2016 was 1841.54 MMSCM which is 7.70% lower than the cumulative target and 13.13% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
·         Underperformance of wells of KG-OSN-2001/3.
·         M&S Tapti: Production stopped in March 2016.
·         Closure of one well in KG D6.
·         Water loading and sand ingress in Kharsang wells.
·         Underperformance of  Bhagyam field of RJ-ON-90/1 &  & Natural Decline of Mangala wells
·         Underperformance of Raniganj East, Sohagpur West & Raniganj South CBM Blocks

Refinery Production (in terms of Crude oil processed)

3          Refinery production during June, 2016 was 20167.44 TMT which is 1.10% higher than the target for the month and 3.51% higher than the production during corresponding period of last year. Cumulative production during April-June, 2016 was 60273.18 TMT which is 0.88% higher than the target for the period and 7.10% higher than the production during corresponding period of last year. Unit-wise production is given at Annexure-III. Unit-wise production for the month of June, 2016 and cumulatively for the period April-June, 2016 vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.

            Table 3: Refinery Production (TMT)
Oil Company
Target
June (Month)
April-June (Cumulative)
2016-17* (Apr-Mar)
2016-17*
2015-16
% over last year
2016-17*
2015-16
% over last year
Target
Actual
Actual
Target
Actual
Actual
IOCL
64299.99
5545.23
5183.04
4674.73
110.87
16493.87
16097.65
13568.07
118.64
BPCL
24999.95
2045.46
2059.72
1959.34
105.12
6179.86
6202.41
6081.57
101.99
HPCL
16500.42
1251.44
1422.76
1241.24
114.62
4129.60
4479.04
3757.82
119.19
CPCL
10250.20
907.30
915.08
953.71
95.95
2751.60
2642.64
2843.37
92.94
NRL
2669.99
224.17
232.81
260.82
89.26
679.70
687.68
413.07
166.48
MRPL
15300.00
1250.00
1273.82
1463.31
87.05
3895.00
3672.17
3910.82
93.90
ONGC
44.59
1.22
7.76
5.50
141.15
9.04
20.96
13.71
152.97
BORL
6000.00
525.00
532.28
601.08
88.55
1575.00
1682.37
1173.73
143.34
HMEL
9000.00
770.34
878.32
897.02
97.91
2336.70
2743.67
2718.04
100.94
RIL
69561.01
5737.18
5941.75
5737.18
103.57
16625.42
16827.06
16625.42
101.21
EOL
20291.64
1690.99
1720.10
1689.79
101.79
5072.97
5217.51
5171.83
100.88
TOTAL
238917.79
19948.32
20167.44
19483.70
103.51
59748.74
60273.18
56277.43
107.10
*: Provisional

Figure 3: Monthly Refinery Production  


3.1         PSU Refineries’ production during June, 2016 was 11094.99 TMT which is 1.16% lower than the target for the month and 5.08% higher than the production achieved in the corresponding month of last year. Cumulative production during April-June, 2016 was 33802.56 TMT which is 0.98% lower than the target for the period and 10.51% higher than the production during corresponding period of last year. Reasons for shortfall of refinery production of PSU refineries are as under:
      IOCL, Paradip: Throughput is lower as South oil jetty is under commissioning and Continuous Catalytic Reforming Unit under shut-down for maintenance.
      IOCL, Guwahati & Digboi: Lower crude availability.
      HPCL, Mumbai: Crude throughput lower due to delay in crude parcel receipt.
      CPCL, Manali: Crude throughput lower than target to contain VTGO (Hydrocracker was shut down for catalyst scooping activity in Reactor -1 for 7 days).
      CPCL, CBR: Crude throughput lower than target due to planned shutdown of CBR from 27.5.16 to 12.6.16.

3.2       Production in JV refineries during June, 2016 was 1410.60 TMT which is 8.90% higher than the target for the month and 5.84% lower than the production achieved in the corresponding month of last year.Cumulative production during April-June, 2016 was 4426.05 TMT which is 13.15% higher than the target for the period and 13.73% higher than the production during corresponding period of last year.
3.3       Production in private refineries during June, 2016 was 7661.85 TMT which is 3.15% higher than the target for the month and 3.16% higher than the production achieved in the corresponding month of last year. Cumulative production during April-June, 2016 was 22044.58 TMT which is 1.60% higher than the target for the period and 1.13% higher than the production during corresponding period of last year.
3.4       Refinery-wise details of the capacity utilization and production of petroleum products during the month of June, 2016 and cumulatively for the period April-June, 2016 vis-à-vis April, -June, 2015 are given at Annexure-IV and V respectively.